May 2022 –

May 31 2022
June 2 2022
June 8 2022
June 10 2022

November 2018 – May 2019

C1 / C2 Foundation (Before)
C1 / C2 Foundation (Before)
C1 / C2 Foundation (Before)
C1 / C2 Foundation (Before)
East Wall Foundation (Before)
East Wall Original Foundation (Before)
A & C Building’s Uphill Sewer Connection (Before)
A & C Building’s Old Sewer Connection
C5 Floor Joists (Before Sistering)
West Wall Foundation Footing
West Wall Foundation Sill
Helical Drill
Pilings
Original A & C Building Sewer Line
Helical Drilling
A & C Building Sewer, Rerouted
A & C Building Sewer, Rerouted
C1 / C2 Interior Pilings
East Side
East Wall Exterior
East Wall Exterior Pilings
East Wall Exterior Piling
West Wall Foundation Sill
C5 Joist Sistering
Grade Beam and Pile Cap Concrete Form
Grade Beam and Pile Cap Concrete Form
Grade Beam and Pile Cap Concrete Form
East Wall, Interior
East Wall, Exterior
South Wall
East Wall, Interior
Interior Corner, C1-C2-East Wall
NorthWest Corner
C2, C5, C8 Fireplace foundation
A and C Building’s Sewer Clean-out
April 12 2019
April 12 2019
Shoreing at C1, C2 April 23 2019
April 23 2019
April 23 2019