Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

The purpose of this inspection was to locate areas of deterioration on the exteriors of the

condominium buildings located at 24 Lee Street, Marblehead, MA. It should be noted that,

due to the configuration of the buildings, not all areas are accessible without scaffolding or

the use of a lift truck, making detailed inspection of all areas impractical or impossible.

Therefore the approach was to perform a general inspection of all areas and more detailed

evaluation of areas with apparent deterioration.

Orientation: North is considered the BYC side of the complex. East is the harbor side, South

the causeway side, West the Lee St side.

Pictures: Relevant pictures are noted following item descriptions (i.e A01 ,B01, etc.)

Inspection General Notes:

1. Recommended repairs are rated by importance. A “High” rating indicates a critical

issue that should be addressed immediately. “Medium” is an issue that should be

added to the yearly schedule of repairs. “Routine” are items that should be included

in the normal maintenance schedule.

2. Routine: Visual inspection of all building exteriors should be performed annually.

Inspections should include roofs, chimneys, siding, balconies and railings.

3. Routine: Gutters should be inspected and cleaned yearly, preferably in the late fall.

This will help minimize blockage and winter ice dams.

4. High Priority: Strength tests were not performed on the railings. However, several

railings have experienced substantial deterioration requiring replacement and many

others show a flexibility that indicates they probably do not meet the current building

code. A program to replace all “original” railings to bring them to code is strongly

advised.

5. Routine: Several areas, particularly on the walls of Buildings B and D have wooden

shingles that show substantial warping. While no deterioration (rot) was found in most

of these areas, the deformation of these shingles may compromise their effectiveness

in waterproofing the exterior walls. These areas should be included in the annual

inspection and repairs made as necessary.

Building A

1. Building A has been recently repainted and deteriorated siding was located and

repaired as part of that process. A ground level review of the building siding revealed

no indication of siding deterioration.

2. Upper roof

a. Rubber roof and flashings appear in good condition, a new chimney cap has

been installed

b. Medium Priority: The chimney has several cracks that have been caulked and at

least one that has not. Recommend recaulking where needed. (A4)

3. Upper deck

a. Mahogany decking is in good condition. It is being sealed by the condo owner.

(A5)

b. High Priority: Railings are in fair to poor condition. Of the nine rail sections,

three show significant rot on rails and/or balusters, indicating the rail sections

should be replaced. Four post covers and one post cap show significant rot.

Repair or replacement of the entire rail system is required.

4. Lower deck

a. Railings are in good condition

b. Wooden decking generally in good condition. Yearly inspection is recommended

CVM Services, LLC Page 1

Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

c. Support joists are in good condition, but green. Again, yearly inspection is

recommended. (A6)

5. Lower Roof

a. Rubber roof appears in good condition. Several puddles were observed,

indication that the roof does not drain completely (A03)

b. Soft insulation is not good for high traffic areas. If this is other than an

emergency exit roofing protection should be applied

c. Railings are in good condition

d. Medium Priority: Stairs to the ground are in good condition, some minor rust on

supports. The configuration of the stairs does not meet current code and

replacement should be considered.

Building B – South End: This inspection includes only the south end of the building. Areas

undergoing reconstruction due to the fire are excluded.

1. The roof is a combination flat rubber roof with sloped shingled areas on the east and

west sides. These roofs, with associated flashings appear in good condition. (B01)

a. Medium Priority: Several roof vents show significant deterioration and should

be repaired. The chimney has a new concrete cap and many joints have been

caulked. (B02-B03)

b. Medium Priority: The gutter at the southwest corner is filled with leaves and

other debris that is completely blocking drainage and should be cleaned out.

(B05)

2. High Priority: The utility support post attached to the west wall and extending above

the roof is seriously deteriorated and requires repair or replacement. This should be

considered very high priority. (B06, B07)

3. The west fascia is generally in good condition.

a. Medium Priority: Paint on the gutter fascia and soffit is peeling and needs

repair, but no rot in this area was found. Soffit vents have generally been

painted over and blocked and should be cleaned or replaced.

b. Medium Priority: Some rotten shingles were found along the bottom of the wall

adjacent to the electrical conduit entrance and extending southward.

Additional rot was found over the lower window at the south end of the wall.

c. High Priority: The deck at the exit door from Unit B-1 is severely deteriorated

and must be repaired.

d. Medium Priority: Corner trim adjacent to the exit door is rotted and needs

replacement.

4. The south fascia shows much peeling paint and significant warping of some of the

shingles. While not all areas could be accessed from the ground, those that could be

inspected in detail showed no evidence of shingle rot. There was evidence at the third

floor level of insulation foam seeping through joints between the shingles. It is

assumed this insulation was installed as part of the renovation of the adjacent unit

B-8. (B08, B09)

a. Medium Priority: Small areas of deterioration were found in the frame of the

first level air conditioner serving Unit B-3 and the base of the corner fascia at

the southeast corner of the building. These frames should be replaced. (B10)

5. The east fascia is generally in good condition. There are areas of warped shingles, but

no significant deterioration was found.

6. High Priority: Roof drainage downspouts at the north end of the east wall have broken

free from the wall and should be reattached. (B11) These downspouts drain large

areas of roof down to a single drain pipe leading under the parking lot. It is understood

CVM Services, LLC Page 2

Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

this commonly causes ice dams in the winter. Modification of the drain system should

be considered. Possible changes include additional downspouts at the other ends of

the gutters or a larger drain system under the parking lot.

7. High Priority: The railings serving the deck for Unit B-3 (on the roof of Bldg D) are

dangerously deteriorated and require immediate repair or replacement. As stated

below, the Bldg D exterior shingles adjacent to this deck are also in poor condition and

require replacement. The decking is in good condition but replacement with composite

material should be considered as part of the repair project.

8. It should be noted that roof drainage from the south end of Bldg B and much of the

west side of Bldg D empties into the passage between the two buildings. This creates

icing problems in the winter and an alternate drainage configuration should be

implemented.

B/D Connector

1. The B-7 deck over Unit B-3 has been refurbished with composite decking which is in

good condition. The framing below is not accessible. The sill on the door leading from

B-7 to the deck shows significant deterioration and should be replaced. This may be

contributing to the deterioration found in the B-3 dining area wall (see #3 below) and

should be considered a high priority.

2. Medium Priority: The other half of the deck serving B-7 is older decking and framing.

The decking is highly weathered. Some decking repairs have been made, but other

deterioration (rot) was noted and additional repairs are needed. Generally the

framing and decking are in acceptable condition, but the single 2×10 stringer at the

north end of the deck is badly deteriorated and should be replaced: High Priority. (B-D

01-04)

3. High Priority: The shingles on the south wall of the Unit B3 dining area show significant

deterioration at the juncture with the Building B east wall. These should be replaced

and the full extent of the deterioration determined. (B-D-05) The north wall of the

dining area is in good condition with the exception of one piece of corner trim that is

rotted and needs replacement.

Building C

1. Similar to Building A, the east and south fascias of Building C have been recently

painted and repaired and generally appear in good condition. The east fascia also

appears in good condition.

2. High Priority: The north fascia, adjacent to the BYC, shows significant deterioration.

This wall is finished above the level of the BYC roof with wooden shingles and below

the BYC roof level with what appears to be plywood siding. This siding could not be

inspected more than a short distance below the level of the BYC roof.

a. Roof gutter at the northwest corner is pulled away from the fascia. Both fascia

and soffit in this area show significant rot. (C01)

b. Both shingles and siding at the northwest corner show significant rot. (C02-03)

c. A fascia panel just below roof level near the northeast corner is rotten. (C04)

d. Shingles along the north wall showed random areas of rot. Replacement of all

shingles is advised. (C05)

3. Roof

a. The rubber roof is in good condition with flashings, while a little wrinkled at

the perimeter, intact.

CVM Services, LLC Page 3

Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

b. Brick chimneys are in good condition with newly replaced caps. The metal

chimneys show some surface rust, but are in good condition. Periodic

inspection of these is advised. (C06)

4. Balconies/Decks

a. Unit C1: Medium Priority: The exterior deck is made of 1×4 wooden decking

which shows areas of significant deterioration, particularly at or near the step

down to ground level. It is recommended the decking be repaired or replaced.

b. Unit C3: The deck has been recently reconstructed with composite decking and

stainless steel wire railings and is in excellent condition. The fascia and soffit

at the base of the deck are in good condition, however a slight softness was

noted at the outside corner of the fascia. This should be included in the annual

inspection.

c. Unit C4: Decking has been recently replaced and is in excellent condition.

Railings show no sign of deterioration. High Priority: The seat has one rotted

board and the support connection at the south end of the seat has failed and

should be repaired.

d. Unit C5:

i. Entry balcony is in acceptable condition with no obvious deterioration of

decking or rails. Decking nail heads are rusty and stringer supports

below the deck show considerable rust. These should be inspected

regularly and replaced as necessary. Medium Priority: The support angle

below the west end of the deck has undergone significant rusting and

should be replaced.

ii. Decking on the harborside balcony has been replaced with composite

material and is in good condition. The southeast railing section has been

removed and will be replaced as part of the unit renovation. High

Priority: The east rail is deteriorated and should be replaced. The

southwest rail section shows no significant deterioration.

iii.Medium Priority: Harborside window roof is deteriorated and should be

replaced

e. Units C6 & C7: The decks have been recently reconstructed with composite

decking and stainless steel wire railings and are in excellent condition.

f. Unit C8: The balcony is in good condition. Decking has been replaced with

composite material and railings appear in good condition. Support stringers are

in good condition. The center support beam (6”x8” wood) on the harborside

end of the deck has been reinforced with a support post at the exterior end. It

seems this beam was also reinforced with a 2×6 sandwiched to its side. This 2×6

shows significant rot and should be removed. While it is not possible to perform

a full structural analysis, given the support provided by the end post, it is not

felt the 2×6 is needed. (C08)

Building D

1. Roofs over areas of the first, second and third floors are all rubber and appear in good

condition.

2. North Fascia

a. Some shingles adjacent to the D-1 entrance have been replaced and are in good

condition. Medium Priority: Other areas along this wall show significant

deterioration and should be repaired.

b. Medium Priority: Second floor shingles adjacent to the Unit B-3 deck show

significant deterioration and should be replaced. (D01)

CVM Services, LLC Page 4

Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

c. Third floor shingles have been replaced and are in excellent condition.

3. East Fascia

a. 1st Floor: Most of the shingles on this face of the building have been replaced and

are in good condition. A few deteriorated areas remain.

b. 2nd Floor: Fascia shingles have been replaced in some areas, but not all. A few

minor areas of deterioration were found.

c. 3rd Floor: Shingles on the fascia appear in good condition, but need painting.

4. South Fascia

a. This wall has been recently painted and is in good condition. One small area of

shingle deterioration was noted. (D02)

5. West Fascia

a. Routine: Much of this wall has also been recently repainted. Many old, warped

shingles can be seen, but no significant rotting was found. (D03, D04, D05) Again,

the deformation of these shingles may compromise their effectiveness in

waterproofing the exterior walls. These areas should be included in the annual

inspection and shingles replaced as needed.

b. High Priority: An area at the west edge of the Unit B-3 deck has significant

drainage issues which should be addressed. (D16)

6. Balconies/Decks

a. 1st floor North End: High Priority: Decking at the north end shows numerous areas

of deterioration and should be repaired or replaced. Framing was not accessible

for evaluation. Railing seems very weak and should be strengthened.

b. 1st Floor East Side: High Priority: Railing along the east side of the balcony

adjacent to Unit D-1 is very weak and should be reinforced or replaced. The deck

fascia in this area is rotted and should be replaced. Decking and stringers along the

remainder of the building at this level have been repaired where necessary and

seem in good condition. The fascia shows no rot but is seriously weathered.

Railings are better than adjacent to Unit D-1, but still may not meet code. (D06,

07, 08) The foundation under this area shows significant deterioration which should

be addressed. (D09)

c. 2nd Floor East Side: The original 2×6 decking has been covered with sleepers and

1×4 decking. The original decking and cantilevered support stringers seem in good

condition except for two areas showing rot near the deck fascia at 21’ and 25’ from

the south corner of the building. (D10) The 1×4 decking above is in reasonable

condition, with some deteriorated areas needing repair, Medium Priority, and some

areas having been repaired. (D11) The concern here is that water can collect in

the space between the original and new decking and accelerate deterioration of

both levels of decking.

i. Areas of the deck support numerous pots and planters for flowers and other

plants. These were not moved to inspect the deck underneath, but the

concern here is they provide areas for water to collect, not dry out, and

accelerate deterioration of the decking. (D12) It is recommended all

planters and pots be placed on bases with “legs” or “feet” that keep the

pots above the decking and allow the decking to dry out.

ii. High Priority: Serious deterioration was found in the framing supporting the

egress stair from the third floor. This was pointed out to the management

team and temporary support has been installed. (D13) An adjacent balcony

support also shows significant deterioration. (D14)

CVM Services, LLC Page 5

Lee Street Condominiums

Exterior Inspection Report Rev. August 2, 2015

iii.High Priority: A water leak has been reported in Unit D-2 under the D-4 deck

near the chimney. While no issues were observed at the deck level, there

may be a roofing problem under the deck. Additional inspection is required.

d. 3rd Floor East Side: Decking and deck framing appear generally in good condition,

with some small areas of rotted decking found, Medium Priority. Again, areas of the

deck support numerous pots and planters for flowers and other plants. These were

not moved to inspect the deck underneath, but the concern here is they provide

areas for water to collect, not dry out, and accelerate deterioration of the

decking. (D15)

e. South end egress stairs: Generally these are in good condition with the exception

noted above. It is understood these stairs are to be replaced.

Retaining Walls

1. The wall between the condominium complex and the BYC has been the subject of much

inspection and discussion. High Priority: The concrete block wall adjacent to the NW

corner of Bldg C shows significant deterioration and movement and should be removed

and replaced. This will require the hiring of a structural engineer to assure the new wall

will perform properly. It is recommended the remaining stone wall be regrouted and the

position of the wall face monitored every six to twelve months to determine if it is, in

fact, moving.

2. Harborside Sea Wall

a. High Priority: The harborside sea wall has shown some recent and ongoing

deterioration of the mortared section above high water requiring repair and

regrouting. Requirements of the Conservation Commission should be finalized so

that repairs can begin.

b. Routine: The condition of the sea wall below high water should be reviewed as part

of the yearly building inspections and repairs performed as necessary.

CVM Services, LLC Page 6